2021
DOI: 10.3389/fspor.2021.689341
|View full text |Cite
|
Sign up to set email alerts
|

Assessment of Sprint Parameters in Top Speed Interval in 100 m Sprint—A Pilot Study Under Field Conditions

Abstract: Improving performances in sprinting requires feedback on sprint parameters such as step length and step time. However, these parameters from the top speed interval (TSI) are difficult to collect in a competition setting. Recent advances in tracking technology allows to provide positional data with high spatio-temporal resolution. This pilot study, therefore, aims to automatically obtain general sprint parameters, parameters characterizing, and derived from TSI from raw speed. In addition, we propose a method f… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
11
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
5

Relationship

1
4

Authors

Journals

citations
Cited by 5 publications
(11 citation statements)
references
References 52 publications
0
11
0
Order By: Relevance
“…Especially for validation purposes, the study design should focus on an appropriate criterion measurement system. The criterion measurement system in the current study, Optogait, is a commonly accepted method for ground truth data acquisition [7,13]. The recent study's setup-including the alternation of the 50-m corridor-was also used in other studies [7].…”
Section: Discussion Of Methodsmentioning
confidence: 99%
See 4 more Smart Citations
“…Especially for validation purposes, the study design should focus on an appropriate criterion measurement system. The criterion measurement system in the current study, Optogait, is a commonly accepted method for ground truth data acquisition [7,13]. The recent study's setup-including the alternation of the 50-m corridor-was also used in other studies [7].…”
Section: Discussion Of Methodsmentioning
confidence: 99%
“…The criterion measurement system in the current study, Optogait, is a commonly accepted method for ground truth data acquisition [7,13]. The recent study's setup-including the alternation of the 50-m corridor-was also used in other studies [7]. Additionally, the time-synchronization of all systems could improve the insights during the algorithm development.…”
Section: Discussion Of Methodsmentioning
confidence: 99%
See 3 more Smart Citations