Assessment of synchronous interactive devices for BIM project coordination: Prospective ergonomics approach

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
16
0
1

Year Published

2020
2020
2024
2024

Publication Types

Select...
5
4

Relationship

0
9

Authors

Journals

citations
Cited by 38 publications
(17 citation statements)
references
References 19 publications
0
16
0
1
Order By: Relevance
“…Three-dimensional coordination is defined as an iterative process aimed at comparing different 3D models in order to reduce problems and conflicts. Research has shown the benefits of 3D coordination, whose main objective is to eliminate conflicts prior to the construction or installation of projects, making it a preventive use [42]. It is also used to check and detect problems, implying that it can also be classified as reactive.…”
Section: Construction Control ✓mentioning
confidence: 99%
“…Three-dimensional coordination is defined as an iterative process aimed at comparing different 3D models in order to reduce problems and conflicts. Research has shown the benefits of 3D coordination, whose main objective is to eliminate conflicts prior to the construction or installation of projects, making it a preventive use [42]. It is also used to check and detect problems, implying that it can also be classified as reactive.…”
Section: Construction Control ✓mentioning
confidence: 99%
“…The list of site managers was compiled using LinkedIn which has been used by earlier studies (e.g. Ahmad et al 2018;Kubicki et al 2019). A search was made to identify site managers in Sweden using alternative Swedish titles including "platschef" and "produktionschef" (both refer to site managers).…”
Section: Questionnaire Designmentioning
confidence: 99%
“…A comparison of team interactions in traditional and BIM-Lean management was conducted in [26]. Kubicki et al [5] dealt with the tasks of individual participants in BIM project coordination, designing procedures and diagrams of BIM project cooperation, analyzing the software and devices used (e.g., touch "smart" devices during coordination meetings), interaction of individual participants, and evaluated the effectiveness of resolving construction clashes.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Despite the growing use of Building Information Modeling (BIM) and the increasing demand for BIM models in the private and public sector, the national specification and recommendations for the geometric and non-geometric (information) details of Project Information Models (PIM) and Asset Information Models (AIM) are absent in Slovakia (for further reference, expression "BIM model" is used to cover both PIM and AIM [1,2]) [3]. The situation is similar to the specification and description of new positions that are interconnected with using BIM, e.g., BIM manager, BIM coordinator, and so on [4][5][6][7]. The role of such important employees who create, coordinate, and verify BIM models, and employees who are in charge of the data management and implementation of BIM throughout the company, are not yet officially defined.…”
Section: Introductionmentioning
confidence: 99%