2015
DOI: 10.1016/j.rser.2015.02.044
|View full text |Cite
|
Sign up to set email alerts
|

Assessment of transformation strategies for the German power sector under the uncertainty of demand development and technology availability

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

1
13
0

Year Published

2016
2016
2023
2023

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 20 publications
(14 citation statements)
references
References 27 publications
1
13
0
Order By: Relevance
“…This temporal representation allows for better assessment of power system sizing. Within this framework, authors obtained similar results as in [16] concerning the trade-off between the different mitigation technologies (wind power, nuclear power, CCS and gridextensions) [17]. A similar study was conducted by Schmid et al for the European and MENA 7 power system with the LIMES-EU model [18].…”
Section: State-of-the-art On the Impacts Of Vre Penetration On Power supporting
confidence: 62%
See 1 more Smart Citation
“…This temporal representation allows for better assessment of power system sizing. Within this framework, authors obtained similar results as in [16] concerning the trade-off between the different mitigation technologies (wind power, nuclear power, CCS and gridextensions) [17]. A similar study was conducted by Schmid et al for the European and MENA 7 power system with the LIMES-EU model [18].…”
Section: State-of-the-art On the Impacts Of Vre Penetration On Power supporting
confidence: 62%
“…This means no demand elasticity and no demand-response technologies available 16. In variants v6 and v7, the same high biomass potential as in variant v5 was assumed because there were not enough RES potentials, considering the assumptions summed up inTable 2, for the model to meet demand with a constraint on VRE penetration 17. The French National Environment and Energy Management Agency…”
mentioning
confidence: 99%
“…In this context, the results of this study suggest that the government should make serious efforts to continue firmly toward creating reliable and positive short-and long-run policies with regard to firms' economic performance. Such efforts should consider limited financial resources [58,59], uncertainty concerning technological prospect regarding R&D costs and eventual performance [60][61][62][63], uncertainty about the demand and preferences of different customer groups regarding the characteristics of RETs [60,61,64,65], concerns over spillovers, accumulated technological knowledge, and practical know-how that firms possess by conducting innovation activities. Other firms could freely use these resources to develop their technology and productivity [66][67][68][69][70][71], which are the main reasons for the difficulty in fully utilizing innovation potential by firms in the RET sector.…”
Section: Discussionmentioning
confidence: 99%
“…The model for Greece in Koltsaklis et al [4], for instance, is divided into five geographical zones, so as to enable policy makers to utilize the model for planning and scenario analysis. Also for planning purposes, the model of Germany in Ludig et al [5] is divided into five regions that correspond to the regions observed by transmission system operators (TSO) in the country. Heitmann et al [6] introduce a more detailed model for Germany that features 29 nodes in an effort to analyze the influence of uncertain and fluctuating parameters such as wind supply on the existing electricity system.…”
Section: Introductionmentioning
confidence: 99%