Automated 3D compliance checking in pipe spool fabrication

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
35
0

Year Published

2015
2015
2024
2024

Publication Types

Select...
4
3
2

Relationship

3
6

Authors

Journals

citations
Cited by 72 publications
(35 citation statements)
references
References 39 publications
0
35
0
Order By: Relevance
“…Furthermore, it may be difficult to track and record changes based on conscious decisions that are made during construction. It can even be more difficult to adequately track and record deviations that are more subtle and not emanating from conscious decisions (e.g., deviations due to poor workmanship) (Nahangi and Haas 2014). Most of the research efforts in the field of project control still focus on the development of cost control models where the earned value concept has proven to be the most reliable tool for tracking and control of construction projects (Xiong et al 2013).…”
Section: Challenges With Progress Tracking and Technology Gapsmentioning
confidence: 99%
“…Furthermore, it may be difficult to track and record changes based on conscious decisions that are made during construction. It can even be more difficult to adequately track and record deviations that are more subtle and not emanating from conscious decisions (e.g., deviations due to poor workmanship) (Nahangi and Haas 2014). Most of the research efforts in the field of project control still focus on the development of cost control models where the earned value concept has proven to be the most reliable tool for tracking and control of construction projects (Xiong et al 2013).…”
Section: Challenges With Progress Tracking and Technology Gapsmentioning
confidence: 99%
“…While existing methods for analysis, detection and control of dimensional variability in the construction industry can utilize proactive 3D analysis techniques such as spatial change analysis [11] or automated compliance checking [12], the majority of variation control techniques during construction are still performed reactively (i.e., problems related to dimensional variability are only solved once they have occurred). This often creates a grey area during a project when variations in the field create installation challenges for specific contractors because the assumption of risk for out-oftolerance occurrences is not well defined.…”
Section: Existing Approaches For Dimensional Control In Constructionmentioning
confidence: 99%
“…Hence, it is not a sufficient practice to consider these steps independently, especially when using them to measure variations that require a high level of accuracy. Moreover, most of the existing research works in this realm of research are about the assessment of surface flatness, whereas the capability of existing commercially available software for deviation analyses can also be used to assess other types of geometric variations (Nahangi and Haas 2014). Here the question arises: What method of deviation analysis is most suitable for each type of tolerances?…”
Section: Introductionmentioning
confidence: 99%