2023
DOI: 10.1061/(asce)cp.1943-5487.0001055
|View full text |Cite
|
Sign up to set email alerts
|

Automated Model-Based 3D Scan Planning for Prefabricated Building Components

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3

Citation Types

0
4
0

Year Published

2023
2023
2025
2025

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 22 publications
(4 citation statements)
references
References 43 publications
0
4
0
Order By: Relevance
“…Cost calculation on a construction project is very sensitive and essential, this cost would become a main consideration in the implementation on a project. In implementing a project, cost planning requires high accuracy in calculating the volume of a work and analyzing the unit costs (Abdel-Hamid, 2023;Son, 2023). Lack of accuracy when calculating the volume of work will cause the estimated implementation cost to be very high and would cause waste of materials that cannot be utilized anymore and become a building waste.…”
Section: Introductionmentioning
confidence: 99%
“…Cost calculation on a construction project is very sensitive and essential, this cost would become a main consideration in the implementation on a project. In implementing a project, cost planning requires high accuracy in calculating the volume of a work and analyzing the unit costs (Abdel-Hamid, 2023;Son, 2023). Lack of accuracy when calculating the volume of work will cause the estimated implementation cost to be very high and would cause waste of materials that cannot be utilized anymore and become a building waste.…”
Section: Introductionmentioning
confidence: 99%
“…A building assembled by prefabricated components on the construction site is called a prefabricated building [1][2][3][4][5][6]. On September 27, 2016, the State Council issued the Guidelines on Vigorously Developing Prefabricated Buildings by the General Office of the State Council, which clearly defined the key areas for vigorously developing prefabricated buildings and steel structures, the proportion of prefabricated buildings in new buildings in the future, and the key cities for developing them [7][8][9][10][11].…”
Section: Introductionmentioning
confidence: 99%
“…Consequently, numerous studies have been conducted in the construction field to implement automated measurements. These automated systems can be employed to inspect the dimensional accuracy of factory‐produced construction components, such as precast concrete (PC) elements, thereby preventing quality issues that may arise during or after the construction process (Kim et al., 2016; Son & Han, 2023). With the use of construction robots or drones, defects such as incorrect dimensions or cracks in construction components can be measured, thus enabling more efficient construction tasks (Shi et al., 2023; Yamaguchi & Mizutani, 2022).…”
Section: Introductionmentioning
confidence: 99%