1992
DOI: 10.1016/s0007-8506(07)61140-8
|View full text |Cite
|
Sign up to set email alerts
|

Automated Sequencing and Subassembly Detection in Assembly Planning

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
95
0
4

Year Published

1995
1995
2021
2021

Publication Types

Select...
5
5

Relationship

0
10

Authors

Journals

citations
Cited by 210 publications
(99 citation statements)
references
References 9 publications
0
95
0
4
Order By: Relevance
“…To conclude the geometric precedence feasibility, the interference matrix is used in this work. The interference matrix was first proposed by Dini [21] in assembly planning, and it can also be used for precedence feasibility judgment in disassembly planning. …”
Section: Geometric Precedence Feasibility In Disassembly Planningmentioning
confidence: 99%
“…To conclude the geometric precedence feasibility, the interference matrix is used in this work. The interference matrix was first proposed by Dini [21] in assembly planning, and it can also be used for precedence feasibility judgment in disassembly planning. …”
Section: Geometric Precedence Feasibility In Disassembly Planningmentioning
confidence: 99%
“…To represent the set of assembly sequences completely, Homen De Mello and Sanderson proposed an AND/ OR graph representation for all the possible configuration of the assembly and generate the assembly sequences for a product using a decomposition method based on the assumption that disassembly sequence is the reverse of a feasible assembly sequence [3]. But then the resultant graph is very large and the number of nodes grows exponentially as the number of parts increases [4]. In the part ordering method proposed by Lee and Ko, a simple sequence is generated and interference checking ensures that the parts to be assembled do not collide during assembly [5].…”
Section: Literature Reviewmentioning
confidence: 99%
“…Some works were found in the literature that consider these problems, and one of them was developed by Dini and Santochi (1992), who analyzed subassemblies and assembly sequences based on the mathematical model of the product, obtained through the definition of three matrices: interference, contact and connection. The possible subassemblies are detected automatically when they satisfy some mathematical conditions applied to those matrices.…”
Section: Assembly Planningmentioning
confidence: 99%