2012 IEEE Power and Energy Society General Meeting 2012
DOI: 10.1109/pesgm.2012.6344836
|View full text |Cite
|
Sign up to set email alerts
|

Automated test procedures for accuracy verification of Phasor Measurement Units

Abstract: The continuous development of electric power systems characterized by an increasing potential of decentralized energy generation requires high precision measurement technologies for an effective and reliable network monitoring and system state assessment to ensure the high level of present and future security of energy supply. One possibility to capture system parameters, which has been established primarily within transmission networks, is the use of Phasor Measurement Units (PMU). Taking Smart Grid discussio… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2016
2016
2019
2019

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 3 publications
0
2
0
Order By: Relevance
“…The proposed algorithm was implemented in the developed and certified test bench to verify the accuracy of devices under test (DUT). The test bench, its components and functionality are described in detail by [27].…”
Section: Automated Test Benchmentioning
confidence: 99%
See 1 more Smart Citation
“…The proposed algorithm was implemented in the developed and certified test bench to verify the accuracy of devices under test (DUT). The test bench, its components and functionality are described in detail by [27].…”
Section: Automated Test Benchmentioning
confidence: 99%
“…The measuring system provides two ways of data acquisition (DAQ), see Fig. [27] An arbitrary waveform generator (AWG), which can perform any complex output signals and test sequences, is responsible for the input signals.…”
Section: Automated Test Benchmentioning
confidence: 99%