2020
DOI: 10.2478/sjce-2020-0019
|View full text |Cite
|
Sign up to set email alerts
|

Automated Verification of Building Components Using BIM Models and Point Clouds

Abstract: One of the most important parts of construction work is the verification of the geometry of the parts of structures and buildings constructed. Today this procedure is often semi- or fully automated. The paper introduces an approach for the automated verification of parts of buildings, by comparing the design of a building (as-planned model), derived from a Building Information Model (BIM) in an Industry Foundation Classes (IFC) exchange format to a terrestrial laser scanning (TLS) point cloud (as-built model).… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 9 publications
0
2
0
Order By: Relevance
“…After analyzing the tasks of the operational stage [22][23][24][25][26][27][28][29][30][31][32][33][34][35][36][37][38][39][40], it can be noted that to solve most tasks, the requirements for LOD and LOI must correspond to a high level. Although the requirements for LOD, LOI and LOA may be low for some tasks, it is recommended that the development of requirements proceed from the perspective of using AIM to solve a set of operational tasks and determine LOD, LOI and LOA.…”
Section: Production Tasks At Operation Stagementioning
confidence: 99%
“…After analyzing the tasks of the operational stage [22][23][24][25][26][27][28][29][30][31][32][33][34][35][36][37][38][39][40], it can be noted that to solve most tasks, the requirements for LOD and LOI must correspond to a high level. Although the requirements for LOD, LOI and LOA may be low for some tasks, it is recommended that the development of requirements proceed from the perspective of using AIM to solve a set of operational tasks and determine LOD, LOI and LOA.…”
Section: Production Tasks At Operation Stagementioning
confidence: 99%
“…1) is scan-to-BIM the most suitable workflow to create the high-quality digital copy (or twin) of the real in-situ elements. [3,17]…”
Section: Mep Modeling In Bimmentioning
confidence: 99%