eWork and eBusiness in Architecture, Engineering and Construction 2018
DOI: 10.1201/9780429506215-28
|View full text |Cite
|
Sign up to set email alerts
|

Automatic development of Building Automation Control Network (BACN) using IFC4-based BIM models

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…The integration between the BIM and BAS domains has been investigated in previous studies both to translate BAS design information into BIM (Vieira 2015, Tang et al 2020, and to apply various building services, including HVAC control strategies (Sanz et al 2018, Benndorf et al 2017, Sporr et al 2019, and fault detection and diagnostics algorithms (Andriamamonjy et al 2018). While these methods revealed that BAS information can be properly represented by BIM, the integration between BIM and multiple BAS communication protocols and control applications remains limited.…”
Section: Introductionmentioning
confidence: 99%
“…The integration between the BIM and BAS domains has been investigated in previous studies both to translate BAS design information into BIM (Vieira 2015, Tang et al 2020, and to apply various building services, including HVAC control strategies (Sanz et al 2018, Benndorf et al 2017, Sporr et al 2019, and fault detection and diagnostics algorithms (Andriamamonjy et al 2018). While these methods revealed that BAS information can be properly represented by BIM, the integration between BIM and multiple BAS communication protocols and control applications remains limited.…”
Section: Introductionmentioning
confidence: 99%