Autonomous production tracking for augmenting output in off-site construction

Abstract: Problems in existing methods of production tracking in off-site construction result in schedule delays and increased costs. To eliminate these deficiencies, an autonomous production tracking that analyzes real-time production data is proposed. A specific implementation of the proposed production tracking mechanisms has been developed for a large off-site construction plant in Australia, and is in the process of installation. The paper shows that: (i) The production model in off-site construction is always nonl… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
39
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 69 publications
(50 citation statements)
references
References 54 publications
1
39
0
Order By: Relevance
“…The experienced respondents placed emphasis on practical problems in the production and installation process. However, the inexperienced ones pay more attention to the potential risk and expenses [61], such as training cost of professional personnel [44], procurement costs of machine [35]…”
Section: T-testmentioning
confidence: 99%
“…The experienced respondents placed emphasis on practical problems in the production and installation process. However, the inexperienced ones pay more attention to the potential risk and expenses [61], such as training cost of professional personnel [44], procurement costs of machine [35]…”
Section: T-testmentioning
confidence: 99%
“…The screen overlays a virtual 3D model of what the structure will look like (Pena-Mora and Dwivedi 2002). Researchers are currently addressing practical challenges related to mobile field implementation of AR such as user comfort, power limitations, ability to function in harsh environments, robust image registration for outdoor uncontrolled conditions, filtering ambient noise and data interferences, and adding more interactivity features to the AR interface (Arashpour et al 2015). Table 4 evaluates AR from the perspective of criteria found in the literature.…”
Section: Augmented Realitymentioning
confidence: 99%
“…In the context of project management, a project management tool based on 4D simulation is an effective and popular method which facilitates the exploration, description and interpretation of the processes and behaviors involved in construction projects. [59] There is clearly a need for both short-term management (of the order of an hour or a shift) that can resolve problems quickly and accurately by measuring task procedures and resource quantities and then producing modules suitable for short processes, as well as long-term management (that might depend, for example, on the day of the week [19]) that provides the parametric information required to achieve goals related to the module manufacturing schedule, material quantity, and quality [62].…”
Section: Bim-based 4d For Managing Module Manufacturingmentioning
confidence: 99%
“…It is particularly important to manage the productivity of the various module manufacturing processes, as delays at this stage can have a serious knock-on effect that adversely impacts later processes such as module transport, site delivery, hoisting, and installation [19,36]. Risks such as insufficient manufacturing planning, limited work time, limited resources, spatial interference, reduced worker performance, and information limitations can lead to module manufacturing work delays, increased costs, and inferior quality [16,[37][38][39][40].…”
Section: Module Manufacturing Process Managementmentioning
confidence: 99%
See 1 more Smart Citation