2013
DOI: 10.1016/j.fusengdes.2013.01.016
|View full text |Cite
|
Sign up to set email alerts
|

Availability, reliability and logistic support studies of the RF power system design options for the IFMIF accelerator

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2015
2015
2023
2023

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(1 citation statement)
references
References 2 publications
0
1
0
Order By: Relevance
“…The ones that will have an important impact on the availability are to change the RF power system to solid-state technology [9], to have hot spare cryomodules for the SRF linac, and to include multiple redundancies in many ancillary systems. These proposals should be further evaluated before being included in the IFMIF accelerator reference design (e.g., feasibility and cost).…”
Section: Discussionmentioning
confidence: 99%
“…The ones that will have an important impact on the availability are to change the RF power system to solid-state technology [9], to have hot spare cryomodules for the SRF linac, and to include multiple redundancies in many ancillary systems. These proposals should be further evaluated before being included in the IFMIF accelerator reference design (e.g., feasibility and cost).…”
Section: Discussionmentioning
confidence: 99%