Proc. Indon. Petrol. Assoc., Digital Technical Conference, 2020 2020
DOI: 10.29118/ipa20-e-9
|View full text |Cite
|
Sign up to set email alerts
|

Banyu Urip Upper Perforation Shut-off: A Success Story of Hydroformed Expandable Casing Patch Installation to Reduce GOR and Maximize Oil Production

Abstract: ExxonMobil Cepu Limited (EMCL), as the operator of Banyu Urip field in Cepu Block, Indonesia, observed several oil wells with high Gas Oil Ratio (GOR) after several years of production. Oil production curtailment was expected due to limited surface gas handling capacity. Additional stand-off against reservoir gas cap shall be established by performing top perforation interval shut-off to reduce GOR and maximize oil production. Perforation shut-off became more challenging due to high concentrations of H2S and C… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
references
References 0 publications
0
0
0
Order By: Relevance