2013
DOI: 10.1109/tste.2013.2247428
|View full text |Cite
|
Sign up to set email alerts
|

Battery Energy Storage Station (BESS)-Based Smoothing Control of Photovoltaic (PV) and Wind Power Generation Fluctuations

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
332
0
9

Year Published

2014
2014
2021
2021

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 772 publications
(341 citation statements)
references
References 23 publications
0
332
0
9
Order By: Relevance
“…The deviation of T s from the steady state and the derivative of F t are penalized to reduce the wind turbine load. In the fourth term, in order to facilitate the long term and stable operation of the ESS unit, its SOC is limited within the range of close to the medium SOC level C mid as much as possible [21]. Q P , Q T , Q F and Q C are the weighting factors.…”
Section: D-mpc Using Fast Gradient Methods 41 Mpc Problem Formulationmentioning
confidence: 99%
“…The deviation of T s from the steady state and the derivative of F t are penalized to reduce the wind turbine load. In the fourth term, in order to facilitate the long term and stable operation of the ESS unit, its SOC is limited within the range of close to the medium SOC level C mid as much as possible [21]. Q P , Q T , Q F and Q C are the weighting factors.…”
Section: D-mpc Using Fast Gradient Methods 41 Mpc Problem Formulationmentioning
confidence: 99%
“…In [18,19], the BESS is connected to the 24.9 kV distribution system. Reference [12] describes the demonstration project of China. The State Grid Corporation of China (SGCC) is building the national wind/PV/BESS and transmission joint demonstration project and it is located in the region of Zhangbei, Hebei, China.…”
Section: System Configuration Of Proposed Reclosing Techniquementioning
confidence: 99%
“…The demonstration project is scheduled in three stages. Now, it is in the first stage and at the end of December, 2011, a 100 MW wind farm, a 40 MW PV farm, and 14 MW/63 MWh lithium-ion BESS have been built at Zhangbei [12]. In this project, the BESS is connected to the high voltage power grid via transformer.…”
Section: System Configuration Of Proposed Reclosing Techniquementioning
confidence: 99%
See 1 more Smart Citation
“…Nas últimas décadas, a geração de eletricidade por energia fotovoltaica e energia eólica recebeu atenção considerável em todo o mundo [1]. A maioria dos países está investindo no estudo de novas fontes de energia que podem ser conectadas ao sistema de distribuição para diversificar a matriz e evitar cenários de crise energética.…”
Section: Introductionunclassified