2021
DOI: 10.1109/access.2021.3109108
|View full text |Cite
|
Sign up to set email alerts
|

Battery Storage Participation in Reactive and Proactive Distribution-Level Flexibility Markets

Abstract: The research leading to these results has received funding from the European Union's Horizon 2020 research and innovation programme under grant agreement No 863876 in the context of the FLEXGRID project. The contents of this document are the sole responsibility of authors and can under no circumstances be regarded as reflecting the position of the European Union.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
1
0

Year Published

2021
2021
2025
2025

Publication Types

Select...
7

Relationship

1
6

Authors

Journals

citations
Cited by 14 publications
(2 citation statements)
references
References 28 publications
0
1
0
Order By: Relevance
“…In the project emphasis is given on the integration of the future distribution level markets with the existing market structure. In that manner, article [100] observes integration of two types of the distribution level markets. One type is cleared before the day-ahead energy market, while the other is cleared after.…”
Section: Projectsmentioning
confidence: 98%
“…In the project emphasis is given on the integration of the future distribution level markets with the existing market structure. In that manner, article [100] observes integration of two types of the distribution level markets. One type is cleared before the day-ahead energy market, while the other is cleared after.…”
Section: Projectsmentioning
confidence: 98%
“…The integration of RE into the grid in a power system is mainly driven by the flexibility of grid operation, and power systems that do not have sufficient ramping capacities will experience operational accidents and economic losses (e.g., load curtailment and discarding of RE) [5][6][7]. FRP has been proposed by many system operators to enhance the ramping capability of power systems [8,9]. The purpose of FRP is to reserve enough flexible ramping capacity for the system in the current period to ensure that the DPG output can meet the demand of the load change in the following period, offers and at the same time can reasonably compensate for the DPG provided by FRP.…”
Section: Introductionmentioning
confidence: 99%