Proceedings of the 2003 Bipolar/BiCMOS Circuits and Technology Meeting (IEEE Cat. No.03CH37440)
DOI: 10.1109/pac.2003.1289185
|View full text |Cite
|
Sign up to set email alerts
|

Beam position monitoring system for the 1.5GeV transport line of NSRRC

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…It is used to accelerate particles to a stable energy level, and then the particles are transferred to the storage ring. The transmission line between the booster ring and the storage ring usually consists of a series of magnets that focus the particle beam when it reaches the electron orbit as it is transmitted from the booster ring to the storage ring [1][2][3][4][5]. The parameters of the transmission line must be carefully designed to ensure efficient transport of the particle beam without any loss of beam intensity or quality.…”
Section: Introductionmentioning
confidence: 99%
“…It is used to accelerate particles to a stable energy level, and then the particles are transferred to the storage ring. The transmission line between the booster ring and the storage ring usually consists of a series of magnets that focus the particle beam when it reaches the electron orbit as it is transmitted from the booster ring to the storage ring [1][2][3][4][5]. The parameters of the transmission line must be carefully designed to ensure efficient transport of the particle beam without any loss of beam intensity or quality.…”
Section: Introductionmentioning
confidence: 99%