Behavior of the Dam of the Sayano-Shushenskaya Hydropower Plant Before and After Reconditioning

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
3
0

Year Published

2011
2011
2011
2011

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(3 citation statements)
references
References 0 publications
0
3
0
Order By: Relevance
“…Personnel at the hydroproject, together with specialists from the Lengidroproekt and the French firm Soletange, therefore developed a new procedure for repair operations using epoxy grouts, which was utilized for sealing cracks in both the body of the dam, and also in its rock bed during the period from 1996 through 2002. As a result of the work performed, the seepage flow through the body of the dam and rock bed was reduced by 99.5 and 78%, respectively [5].…”
Section: Brief Historymentioning
confidence: 98%
See 1 more Smart Citation
“…Personnel at the hydroproject, together with specialists from the Lengidroproekt and the French firm Soletange, therefore developed a new procedure for repair operations using epoxy grouts, which was utilized for sealing cracks in both the body of the dam, and also in its rock bed during the period from 1996 through 2002. As a result of the work performed, the seepage flow through the body of the dam and rock bed was reduced by 99.5 and 78%, respectively [5].…”
Section: Brief Historymentioning
confidence: 98%
“…Personnel at the hydroproject, together with specialists from the Lengidroproekt and the French firm Soletange, therefore developed a new procedure for repair operations using epoxy grouts, which was utilized for sealing cracks in both the body of the dam, and also in its rock bed during the period from 1996 through 2002. As a result of the work performed, the seepage flow through the body of the dam and rock bed was reduced by 99.5 and 78%, respectively [5].The repair work had inevitably made itself felt on the behavior of the dam and its rock bed.Briefly summarizing the results of the analysis, it is possible to note:1. Irreversible displacements of the dam in the direction of the tailrace had continued, and was of the order of 40% of the maximum displacements in the key section of the dam.…”
mentioning
confidence: 99%
“…This scenario is not expected but did occur in the Sayano-Shushenskaya arch dam in Russia [1] and the Maneri-Hydel diversion tunnel in India [2]. Therefore, concrete cracking and the water penetration process have been the subject of many researches.…”