“…N An enlightening study into the behaviour of very long cablestayed bridges during erection where dynamic behaviour in a typhoon-prone zone is examined for the Stonecutters Bridge in Hong Kong and the Sutong Bridge across the Yangtze River in China (each with a main span in excess of 1000 m) (Morgenthal and Yamasaki, 2010). N Finally, a very useful paper on estimating the response of cable-stayed bridges in seismic zones with cautionary warnings where estimates may be inaccurate in some cases (Walker and Stafford, 2010).…”