2020
DOI: 10.1061/(asce)be.1943-5592.0001507
|View full text |Cite
|
Sign up to set email alerts
|

Benchmark for Evaluating Performance in Visual Inspection of Fatigue Cracking in Steel Bridges

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

1
29
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
6
2
1

Relationship

1
8

Authors

Journals

citations
Cited by 41 publications
(30 citation statements)
references
References 5 publications
1
29
0
Order By: Relevance
“…The accuracy of visual inspection has been researched by Campbell et al (2019). They had invited a diverse group of 30 inspectors to complete a full day, hands-on inspection of 147 steel bridge specimens to establish a quantitative measure of Fig.…”
Section: Posterior Probabilitiesmentioning
confidence: 99%
“…The accuracy of visual inspection has been researched by Campbell et al (2019). They had invited a diverse group of 30 inspectors to complete a full day, hands-on inspection of 147 steel bridge specimens to establish a quantitative measure of Fig.…”
Section: Posterior Probabilitiesmentioning
confidence: 99%
“…Bridge owners and bridge management departments put large amounts of effort and resources into the visual inspection task, guideline, and personnel [ 5 ]. A qualified inspector needs to go through the qualification, training, and certification of inspectors [ 6 ]. However, the accuracies of visual inspection highly rely on the inspectors’ subjective judgments.…”
Section: Introductionmentioning
confidence: 99%
“…However, the accuracies of visual inspection highly rely on the inspectors’ subjective judgments. According to Campbell et al’s recent study [ 6 ], the experience and training of inspectors, the field temperature during visual inspection, and the inspection duration were significantly correlated with the detection rate. The objectives of the visual inspection items in their study were exactly fatigue cracks in steel bridges.…”
Section: Introductionmentioning
confidence: 99%
“…Early stage assessment is often restricted to visual inspections [14][15][16] that are subjective and not always reliable, or calculations of structural capacity [17], which are very conservative with the unrealistic assumptions and models related to loading and material properties. The assessment of RC decks requires methods that can give both the structural characteristics and response of RC structural elements under traffic and environmental loading.…”
Section: Introductionmentioning
confidence: 99%