Benchmarking Non-Hardware Balance of System (Soft) Costs for U.S. Photovoltaic Systems Using a Data-Driven Analysis from PV Installer Survey Results

Abstract: Executive SummaryThis report presents results from the first U.S. Department of Energy (DOE) sponsored, bottomup data-collection and analysis of non-hardware balance-of-system costs-often referred to as "business process" or "soft" costs-for residential and commercial photovoltaic (PV) systems. Annual expenditure and labor-hour-productivity data are analyzed to benchmark 2010 soft costs related to the DOE priority areas of (1) customer acquisition; (2) permitting, inspection, and interconnection; (3) installat… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

2
45
0

Year Published

2013
2013
2019
2019

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 30 publications
(47 citation statements)
references
References 3 publications
2
45
0
Order By: Relevance
“…Overall, these cross-city results are consistent with and add to previous attempts to quantify the national or regional average impact of permitting on installed costs and development times (e.g., Sunrun, 2011;Ardani et al, 2012;Clean Power Finance, 2012). In particular, they demonstrate that national or regional average impacts can mask the moresubstantial impacts that occur at a local level across individual cities.…”
Section: Conclusion and Further Worksupporting
confidence: 86%
See 1 more Smart Citation
“…Overall, these cross-city results are consistent with and add to previous attempts to quantify the national or regional average impact of permitting on installed costs and development times (e.g., Sunrun, 2011;Ardani et al, 2012;Clean Power Finance, 2012). In particular, they demonstrate that national or regional average impacts can mask the moresubstantial impacts that occur at a local level across individual cities.…”
Section: Conclusion and Further Worksupporting
confidence: 86%
“…Building on the Sierra Club effort, Vote Solar created a Solar Permit Map, with additional city-level permitting data contributed by users (Vote Solar, 2013). 7 A National Renewable Energy Laboratory survey of U.S. PV installers reported that residential PV permitting, inspection, and interconnection (PII) labor costs averaged $0.13/W; with an assumed average permitting fee of $0.09/W, total PII costs averaged $0.22/W (Ardani et al, 2012). This compares with a median total installed price of $6.10/W for PV systems less than 10 kW in size and installed in 2011 .…”
Section: Introductionmentioning
confidence: 99%
“…Differences in total system prices among countries can thus be attributed primarily to soft costs. Indeed, installer surveys in Germany, Australia, and Japan have confirmed that soft costs in those countries, across all major soft cost elements, are substantially lower than in the United States , Ardani et al 2012, Friedman et al 2014, RMI and GTRI 2014. Several time-and-motion studies have further homed-in on installation costs, identifying specific aspects of installation practices in Germany and Australia that enable lower labor costs in those countries than in the United States GTRI 2013, 2014).…”
Section: Comparison Of Us Median Installed Prices To Other Internatmentioning
confidence: 99%
“…Since the assessment of U.S. permitting time requirements in 2010 (Ardani et al, 2012), substantial efforts have been made across many U.S. jurisdictions to streamline processes and make reporting requirements more transparent. Among the initiatives are online databases such as www.solarpermit.org, the U.S. Department of Energy's "Rooftop Solar Challenge" with best practices shared in an online resource center, and state legislation limiting permit fees in Vermont, Colorado, and California.…”
Section: Figure 8: Installation Labor Hours and Costs In The United Smentioning
confidence: 99%
“…We devised a bottom-up cost model for U.S. systems using hardware cost estimates for 2011 (GTM Research and SEIA, 2012;Goodrich et al, 2012) and soft cost benchmarks for 2010 (Ardani et al, 2012). Figure 10 summarizes the identified sources for the price difference of $3.19/W between U.S. and German residential systems installed in 2011.…”
Section: Figure 8: Installation Labor Hours and Costs In The United Smentioning
confidence: 99%