2023
DOI: 10.1016/j.cor.2023.106251
|View full text |Cite
|
Sign up to set email alerts
|

Berth and quay crane allocation and scheduling problem with renewable energy uncertainty: A robust exact decomposition

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 11 publications
(2 citation statements)
references
References 27 publications
0
2
0
Order By: Relevance
“…The quay-crane-allocation problem (QCAP), initially introduced by Park and Kim [7], aims to integrate berth allocation and QC scheduling. Recently, it has been proven that the QCAP becomes effective if performed simultaneously with the BAP [8]. Figure 1 illustrates the basic concept of the QCAP, using a satellite image of the Ningbo container terminal as an example.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…The quay-crane-allocation problem (QCAP), initially introduced by Park and Kim [7], aims to integrate berth allocation and QC scheduling. Recently, it has been proven that the QCAP becomes effective if performed simultaneously with the BAP [8]. Figure 1 illustrates the basic concept of the QCAP, using a satellite image of the Ningbo container terminal as an example.…”
Section: Introductionmentioning
confidence: 99%
“…Moreover, maritime operations often involve significant costs, and even slight fluctuations in these uncertain parameters can result in substantial economic losses. Given this situation, the modeling of, and research into container port optimization under stochastic conditions are gradually becoming the focus of academic research [8,17,18].…”
Section: Introductionmentioning
confidence: 99%