SPE Russian Oil and Gas Exploration &Amp; Production Technical Conference and Exhibition 2014
DOI: 10.2118/171277-ru
|View full text |Cite
|
Sign up to set email alerts
|

Best Practices for Horizontal Wells Completion Technology and Multistage Fracturing for High Pressure Achimov Formation at Urengoyskoe Field (Russian)

Abstract: Технологии для заканчивания и многостадийного ГРП для сложных горизонтальных скважин c АВПД Ачимовских залежей Уренгойского месторождения А. Аблаев, Д. Зайченко, С Тютиков, А. Инюшина, А. Конченко, SPE, Schlumberger Авторское право 2014 г., Общество инженеров нефтегазовой промышленности Этот доклад был подготовлен для презентации на Российской технической нефтегазовой конференции и выставке SPE по разведке и добыче, 14 -16 октября, 2014, Москва, Россия. Данный доклад был выбран для проведения презентации Прогр… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2015
2015
2019
2019

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…A technical and risk comparison between re-fracturing an existing HW MSF to drilling a sidetrack well and completing it with MSF is given in the Table 1: Figure 15-Fracture geometry as a result of the TVD initiation point within the horizontal wellbore (18) Obviously, from the assessment above it is clear that there is an immediate need to address the following questions though engineering feasibility studies for:…”
Section: Horizontal Wells Sidetrackmentioning
confidence: 99%
“…A technical and risk comparison between re-fracturing an existing HW MSF to drilling a sidetrack well and completing it with MSF is given in the Table 1: Figure 15-Fracture geometry as a result of the TVD initiation point within the horizontal wellbore (18) Obviously, from the assessment above it is clear that there is an immediate need to address the following questions though engineering feasibility studies for:…”
Section: Horizontal Wells Sidetrackmentioning
confidence: 99%