2016
DOI: 10.1007/s11740-016-0679-2
|View full text |Cite
|
Sign up to set email alerts
|

Bi-objective scheduling of flexible flow lines: a gradual transition tabu search approach

Abstract: This paper deals with flexible flow line scheduling problem. Studied researches of the literature assumed that either no setup has to be performed or that setup times are sequence-independent, chiefly. Besides, they are mostly conducted in single objective environment. Therefore, in this study, these two real world concepts are mimicked in the flow line model. The considered objectives of the proposed model are minimizing makespan and total tardiness. Due to the hard solvability of the problem, this research p… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 48 publications
(61 reference statements)
0
0
0
Order By: Relevance