2018
DOI: 10.1051/matecconf/201818002003
|View full text |Cite
|
Sign up to set email alerts
|

Bilateral power supply of the traction network as a first stage of Smart Grid technology implementation in electric traction

Abstract: Abstract. Since 2001, trolleybus system in Gdynia has been involved in many activities related to the reduction of power consumption, both in terms of implementation and research and development. In PKT, in cooperation with SESTO company, started applications of Smart Grid technologies in supply network: the bilateral supply. The paper presents results of this this novel investment.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 7 publications
0
2
0
Order By: Relevance
“…Only mentioned in works such as [53,62,63] If ignored, errors up to 25% in the substation power calculations…”
Section: Bilateral Connectionsmentioning
confidence: 99%
See 1 more Smart Citation
“…Only mentioned in works such as [53,62,63] If ignored, errors up to 25% in the substation power calculations…”
Section: Bilateral Connectionsmentioning
confidence: 99%
“…Typically assumed at a rounded-up nominal value of 650 or 700V such as in [23,62,64] Particularly important for bilaterally connected substations because of the effect on the load-sharing ratio between them…”
Section: Substation Nominal Voltagementioning
confidence: 99%