2019
DOI: 10.1016/j.wasman.2019.03.010
|View full text |Cite
|
Sign up to set email alerts
|

BIM-based automated construction waste estimation algorithms: The case of concrete and drywall waste streams

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

1
52
0
1

Year Published

2019
2019
2023
2023

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 106 publications
(54 citation statements)
references
References 34 publications
1
52
0
1
Order By: Relevance
“…The disassembly and deconstruction analytics tool can also serve as a decision support platform that government and planners can use to evaluate the level of compliance of building designs to circular economy and sustainability requirements. Guerra et al (2019) proposed the use of BIM for the estimation of construction waste based on the delta of construction materials purchased and the materials incorporated into the building structure itself. This tool therefore is not applicable to deconstruction scenarios.…”
Section: Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…The disassembly and deconstruction analytics tool can also serve as a decision support platform that government and planners can use to evaluate the level of compliance of building designs to circular economy and sustainability requirements. Guerra et al (2019) proposed the use of BIM for the estimation of construction waste based on the delta of construction materials purchased and the materials incorporated into the building structure itself. This tool therefore is not applicable to deconstruction scenarios.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Guerra et al (2019) proposed the use of BIM for the estimation of construction waste based on the delta of construction materials purchased and the materials incorporated into the building structure itself. This tool therefore is not applicable to deconstruction scenarios.…”
Section: Review Of Innovative Building Materials Assessment Systemsmentioning
confidence: 99%
“…The model could estimate waste and identify its origin, type, packaging, and other characteristics. In recent years, some authors, such as Akinade et al (2018), Guerra et al (2019), Kim et al (2017), and Mercader-Moyano et al (2017), have developed and continue to develop models supported on building information modelling (BIM) to estimate waste generation based on building design. Akinade et al (2018) used BIM and neural networks to generate a model that could integrate into Autodesk Revit as an add-in component.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Mercader-Moyano et al (2017) used BIM combined with the cost database of Andalucía (Spain) to calculate steel and concrete waste. Guerra et al (2019) provided a study based on automatic measurements on BIM comparing them with purchasing records on an educational building, specifically to concrete and drywall. This approach obtains an estimate of the generated waste, which is useful in the preconstruction phase.…”
Section: Literature Reviewmentioning
confidence: 99%
“…In addition, with the continuous demolition of waste buildings in the process of urbanization, the annual output of construction solid waste in China is increasing. However, compared with Europe, Japan and the United States, the utilization of construction solid waste in China is very low at less than 5% of the annual output [3][4][5][6][7]. The contradiction between the shortage of building materials and the high output of construction solid waste caused by urbanization has brought great pressure and challenge to the sustainable development of China's resources and the environment [8][9][10].…”
Section: Introductionmentioning
confidence: 99%