2017
DOI: 10.1061/(asce)co.1943-7862.0001403
|View full text |Cite
|
Sign up to set email alerts
|

BIM-Based Collaboration Platform for the Management of EPC Projects in Hydropower Engineering

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
32
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
7
1
1

Relationship

0
9

Authors

Journals

citations
Cited by 66 publications
(32 citation statements)
references
References 32 publications
0
32
0
Order By: Relevance
“…Suggestions for future research on 4D BIM acceptance in complex construction projects with abundant data and alternative models are provided. construction plans and generate construction process patterns to assist construction managers [7] and further contribute to the project knowledge codification and personalization [8].Previous studies on BIM application in EPC projects mainly focused on: (1) How to enhance BIM performance in EPC projects [9]; (2) how to promote the performance of EPC projects through applying BIM [10]. But less attention was paid to the technology acceptance process of BIM.…”
mentioning
confidence: 99%
See 1 more Smart Citation
“…Suggestions for future research on 4D BIM acceptance in complex construction projects with abundant data and alternative models are provided. construction plans and generate construction process patterns to assist construction managers [7] and further contribute to the project knowledge codification and personalization [8].Previous studies on BIM application in EPC projects mainly focused on: (1) How to enhance BIM performance in EPC projects [9]; (2) how to promote the performance of EPC projects through applying BIM [10]. But less attention was paid to the technology acceptance process of BIM.…”
mentioning
confidence: 99%
“…Previous studies on BIM application in EPC projects mainly focused on: (1) How to enhance BIM performance in EPC projects [9]; (2) how to promote the performance of EPC projects through applying BIM [10]. But less attention was paid to the technology acceptance process of BIM.…”
mentioning
confidence: 99%
“…Table 3 shows that the top 10 indicators belong mainly to three dimensions: participation, task orientation, and goal effectiveness. The finding operationalizes BIM value in joint participation, task performance, and improvement in project outcomes (Wu & Issa, 2015;Wu et al, 2018;Zhang et al, 2017). The importance of workers' involvement in decision making to establish an organizational climate as proposed by Kwon et al (2016) is elaborated empirically in the context of construction projects by the highest rank of better communicating with decision makers through BIM (CDMT-BIM).…”
Section: Indicators Of Value-added-oriented Bim Climatementioning
confidence: 99%
“…BIM (Building Information Modeling) originated in the United States in the 1970s. Charles Eastman, Jerry Laiserin and some other scholars have redefined its concepts successively and made a comprehensive interpretation of its connotation (Yalcinkaya & Singh, 2015;Zhang, Pan, Wang, Sun, & Wang, 2017). As a new concept and technology, BIM has been widely concerned by scholars and industry insiders in North America, Northern Europe and other areas, and has set off an unprecedented BIM technology frenzy.…”
Section: Introductionmentioning
confidence: 99%