BIM-Based Combination of Takt Time and Discrete Event Simulation for Implementing Just in Time in Construction Scheduling under Constraints

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
34
0
2

Year Published

2021
2021
2024
2024

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 47 publications
(36 citation statements)
references
References 39 publications
0
34
0
2
Order By: Relevance
“…DES is widely accepted by the construction industry as a decision support and project planning tool (AbouRizk, 2010). It provides an effective planning approach with the ability to incorporate uncertainties and complex interactions (Abbasi et al , 2020). In recent years, integrating DES and BIM for construction planning automation has become a popular research topic.…”
Section: Related Workmentioning
confidence: 99%
See 1 more Smart Citation
“…DES is widely accepted by the construction industry as a decision support and project planning tool (AbouRizk, 2010). It provides an effective planning approach with the ability to incorporate uncertainties and complex interactions (Abbasi et al , 2020). In recent years, integrating DES and BIM for construction planning automation has become a popular research topic.…”
Section: Related Workmentioning
confidence: 99%
“…BIM helps DES models to overcome many of their usual applicability challenges such as their need for time-consuming, high-quality data entry and manually updating inputs regularly that requires considerable expert work (Konig et al , 2012; Lu and Olofsson, 2014; Skoogh and Johansson, 2008). Nevertheless, the use of BIM information in DES can be challenging and requires developing appropriate tools for extracting and classifying data (Abbasi et al , 2020).…”
Section: Related Workmentioning
confidence: 99%
“…However, as with every method, DES has limitations that are important to be acknowledged, such as the need to discretize continuous data (Puri and Martinez, 2013), the lack of capacity to add feedback processes (Peña-Mora et al, 2008), and model verification and validation challenges (Zankoul et al, 2015). Of note, to compensate for these limitations, researchers have begun to integrate DES with other simulation techniques often used in the construction engineering and management (CEM) domain, such as agent-based modeling (e.g., Abdelkhalek and Zayed, 2020), system dynamics (e.g., Hwang et al, 2016;Xu et al, 2018), and virtual environments (e.g., Abbasi et al, 2020;Sacks et al, 2015). For instance, efforts have been made to propose a framework to integrate multiple simulation techniques, such as DES, SD, and ABM (Bokor et al, 2019).…”
Section: Introductionmentioning
confidence: 99%
“…Current practices in the domain of construction planning and scheduling are oriented towards automatic schedule development and the application of specialized optimization techniques [15]. Although modern technologies such as BIM have already been applied to the optimization problems in the realm of construction scheduling [16][17][18][19][20][21], additional development and possible extensions are still needed to effectively automatize scheduling practices and improve both customizability and user-friendliness of emerging technologies for practical use [22,23].…”
Section: Introductionmentioning
confidence: 99%