BIM-Based Integrated Framework for Detailed Cost Estimation and Schedule Planning of Construction Projects

Abstract: -With the increasing popularity of Building Information Modeling (BIM), several research studies have focused on its application in the construction industry, and advancements such as developments of BIM-based tools for construction scheduling and cost estimating have been carried out. Nevertheless, these tools are each developed only for one particular aspect of construction management, such as scheduling or cost estimating. As such, most are still limited to the product element level, rather than the constru… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
12
0

Year Published

2016
2016
2022
2022

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 12 publications
(12 citation statements)
references
References 16 publications
0
12
0
Order By: Relevance
“…Defining the construction project scope and establishing the WBS are the first steps to estimate activity costs. Finding applicable unit cost items from construction price databases are the next [111]. Thanks to the use of a unique coding system, cost items related to a project, organization, work package, resources, materials, etc., can be easily integrated [71].…”
Section: Integration Of Wbs and Cbsmentioning
confidence: 99%
See 2 more Smart Citations
“…Defining the construction project scope and establishing the WBS are the first steps to estimate activity costs. Finding applicable unit cost items from construction price databases are the next [111]. Thanks to the use of a unique coding system, cost items related to a project, organization, work package, resources, materials, etc., can be easily integrated [71].…”
Section: Integration Of Wbs and Cbsmentioning
confidence: 99%
“…The first reason is that BIM systems contain enriched information. This facilitates the exchange and interoperability of information making it capable of supporting multiple types of analysis, including PM analyses (e.g., scope, quality, schedule, cost, and risk) [111]. Thanks to the growing popularity of BIM, data automation (at least regarding acquisition and processing) is guaranteeing a more reliable, accurate, and precise scope definition and cost estimation.…”
Section: Bim In the Construction Industrymentioning
confidence: 99%
See 1 more Smart Citation
“…Then, these data are extracted through the Quantity Take-off functionality. As demonstrated by [16], BIM tools support highly accurate quantity take-off and, according to Liu et al [17], BIM offers the best automate approach to generate accurate quantity take-off from 3D product models, even if detailed construction information is not taken into consideration. In this publication, the authors describe a BIMbased integrated framework for construction scheduling and costs estimation.…”
Section: Implementation Of Bim Scheduling In Real Case Studiesmentioning
confidence: 99%
“…In spite of great importance given to cost estimation, it is neither simple nor straightforward due to deficiency of information in the early stages of the project [18]. Such gap in information can be bridged by 5D BIM [19] for better project financing and cash flow control [20]. Integration framework of cost and schedule [21] was developed a few years back and is presently under rapid advancement.…”
Section: Cost As 5d In Building Information Modellingmentioning
confidence: 99%