2020
DOI: 10.1108/jedt-02-2020-0044
|View full text |Cite
|
Sign up to set email alerts
|

BIM-based integrated solution for analysis and management of mismatches during construction

Abstract: Purpose Prompt and effective responses to incompatibilities between as-designed and as-built drawings prevent cost and time overruns and material waste. This paper aims to provide an efficient framework to handle mismatches between these two models with the least negative impact on the whole project. Design/methodology/approach First, 11 most frequent mismatches were identified through questionnaires. Also, the respondents were asked to determine the mismatches’ roots and solutions and the impact of applying… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
8
2

Relationship

4
6

Authors

Journals

citations
Cited by 21 publications
(6 citation statements)
references
References 46 publications
0
5
0
Order By: Relevance
“…The weighing was done in a matrix form to provide a pair-wise comparison for the criteria. The more important the criterion was, the more score it received, given the five-point Likert scale (Abbasi et al , 2020; Gharouni Jafari et al , 2020; Golabchi and Noorzai, 2013).…”
Section: Methodsmentioning
confidence: 99%
“…The weighing was done in a matrix form to provide a pair-wise comparison for the criteria. The more important the criterion was, the more score it received, given the five-point Likert scale (Abbasi et al , 2020; Gharouni Jafari et al , 2020; Golabchi and Noorzai, 2013).…”
Section: Methodsmentioning
confidence: 99%
“…The most important one is that the lighting system should be able to guarantee excellent visual performance, but at the same time, it should reduce exposure to the exhibition (Pedro et al , 2013). Several studies focused on the significant factors in optimizing lighting and energy conservation systems and focusing on economic analysis to improve lighting system performance (Golabchi et al , 2016; Hassanizadeh et al , 2020; Salata et al , 2015; Jalali et al , 2019; Gharouni Jafari et al , 2020; Abbasi et al , 2020; Yang and Nam, 2010; Salata et al , 2015). Table 1 compares several studies investigated with the highest relevance to the present study.…”
Section: Past Studiesmentioning
confidence: 99%
“…, 2021; Evans et al. , 2021; Gharouni Jafari et al. , 2021; Saka and Chan, 2021; Silverio and Suresh, 2021; Tai et al.…”
Section: Introductionmentioning
confidence: 99%