2018
DOI: 10.1002/geot.201800022
|View full text |Cite
|
Sign up to set email alerts
|

BIM pilot project Granitztal tunnel chain – Development of data structures for tunnel structure and track superstructure

Abstract: An essential part of the Koralmbahn line, the Granitztal tunnel chain with a length of about 6.1 km runs between the Lavanttal and the Jauntal valleys and crosses the Deutsch Grutschen, the Granitztal and the Langer Berg. In early 2016, Austrian Railways ÖBB made a decision for the Granitztal tunnel chain project, which was then already under construction, to test the 3D model‐based Building Information Modelling (BIM) design method in addition to conventional 2D design. One essential precondition for the appl… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…By seeing visualisations, they can more easily produce complicated reinforcement or joint details. There are many examples in the literature of large projects implemented using BIM technology [47,48]. The analyses presented in [49] indicate that it is recommended to introduce BIM education at universities to improve the learning of construction management.…”
Section: Bimmentioning
confidence: 99%
“…By seeing visualisations, they can more easily produce complicated reinforcement or joint details. There are many examples in the literature of large projects implemented using BIM technology [47,48]. The analyses presented in [49] indicate that it is recommended to introduce BIM education at universities to improve the learning of construction management.…”
Section: Bimmentioning
confidence: 99%