2018
DOI: 10.1016/j.asej.2017.01.004
|View full text |Cite
|
Sign up to set email alerts
|

BIM2BEM integrated approach: Examining status of the adoption of building information modelling and building energy models in Egyptian architectural firms

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

2
32
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 41 publications
(34 citation statements)
references
References 5 publications
2
32
0
Order By: Relevance
“…Ability to cooperate with the entire team, including the contractor and facility manager who traditionally were late entrants [15]. Return on investment (ROI) has guided companies to implement BIM after studying projects done with BIM [16].…”
Section: Factors Guiding Adoption Of Bimmentioning
confidence: 99%
See 1 more Smart Citation
“…Ability to cooperate with the entire team, including the contractor and facility manager who traditionally were late entrants [15]. Return on investment (ROI) has guided companies to implement BIM after studying projects done with BIM [16].…”
Section: Factors Guiding Adoption Of Bimmentioning
confidence: 99%
“…Benefits of BIM towards an effective ECM include, reduced delivery time, reduced project cost [16] [17] [18], resource saving, better coordination, detection of clashes, better time management [16] [18], improved profitability and customer-client relationship [2]. BIM makes decision management easier [19] and better project management [4].…”
Section: Factors Guiding Adoption Of Bimmentioning
confidence: 99%
“…The difficulty to change people's habits, interoperability problems, and the absence of a BIM use mandate are issues that limit the BIM implementation (Gonzáles Perez, 2015). Khodeir & Nessim, (2018) adds insufficient budgets, lack of knowledge on methods to implement BIM, superior administrative support, experience, and staff skills. One of the most important difficulties for any development is not having a benchmark that allows comparisons to improve and avoid making the mistakes that others have already made.…”
Section: Bim Implementation Around the Worldmentioning
confidence: 99%
“…Malaysia is living a similar situation; there is a low BIM status in the construction industry and the difficulties in BIM adoption are evident (Hanafi et al, 2016). On the other hand, BIM use in Egypt is currently in the phase of spreading and is improving continuously (Khodeir & Nessim, 2018).…”
Section: Introductionmentioning
confidence: 99%
“…At the same time, these companies face the challenge of using Building Energy Models (BEM) to meet energy-saving requirements. Khodeir and Nessim [39] have studied the current application status of BIM2BEM in the Egyptian construction market and analyzed related application barriers. In addition, scholars from New Zealand [40], Sweden [41], and other countries have analyzed the obstacles to the application of BIM in their countries.…”
Section: Introductionmentioning
confidence: 99%