1995
DOI: 10.1061/(asce)0899-1561(1995)7:1(69)
|View full text |Cite
|
Sign up to set email alerts
|

Bitumen Coating versus Plastic Sheeting for Reducing Negative Skin Friction

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2004
2004
2024
2024

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…Different methods to mitigate the negative skin friction of piles include prepressure to reduce soil settlement when constructing a pile foundation, using a casing to avoid direct contact between the pile and soil, and using coatings such as bituminous materials to minimize the skin friction between the pile and soil [26][27][28][29][30]. e latter method is widely used and is the most cost effective.…”
Section: Introductionmentioning
confidence: 99%
“…Different methods to mitigate the negative skin friction of piles include prepressure to reduce soil settlement when constructing a pile foundation, using a casing to avoid direct contact between the pile and soil, and using coatings such as bituminous materials to minimize the skin friction between the pile and soil [26][27][28][29][30]. e latter method is widely used and is the most cost effective.…”
Section: Introductionmentioning
confidence: 99%