2003
DOI: 10.2175/193864703784679260
|View full text |Cite
|
Sign up to set email alerts
|

BNR Rating of the Arlington County Water Pollution Control Plant Through Full-Scale Testing and Calibrated Modeling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Vanrolleghem Abusam et al (2003) presented an example of applying uncertainty propagation from the model output states toward the model parameters. Pitt et al (2003) calibrated BioWin TM to daily data based on a maximum specific nitrifiers growth rate of 0.9 d -1 , along with a nitrifier decay rate of 0.17 d -1 , but had to adjust the specific nitrifiers growth rate to 0.6 d -1 in order to match stress testing diurnal effluent ammonia-N data. Jones et al (3003) made six nitrifiers' maximum specific growth rate measurements at four plants resulting in the adjusted to 20 °C values of 0.85 to 1.05 d -1 .…”
Section: Parameter Estimationmentioning
confidence: 99%
“…Vanrolleghem Abusam et al (2003) presented an example of applying uncertainty propagation from the model output states toward the model parameters. Pitt et al (2003) calibrated BioWin TM to daily data based on a maximum specific nitrifiers growth rate of 0.9 d -1 , along with a nitrifier decay rate of 0.17 d -1 , but had to adjust the specific nitrifiers growth rate to 0.6 d -1 in order to match stress testing diurnal effluent ammonia-N data. Jones et al (3003) made six nitrifiers' maximum specific growth rate measurements at four plants resulting in the adjusted to 20 °C values of 0.85 to 1.05 d -1 .…”
Section: Parameter Estimationmentioning
confidence: 99%