Day 2 Tue, November 14, 2017 2017
DOI: 10.2118/188827-ms
|View full text |Cite
|
Sign up to set email alerts
|

Boost Capacity of Velocity String Completions in Sultanate of Oman by Including Sliding Side Door

Abstract: Velocity strings are routinely installed to remediate liquid loading of gas wells. However, besides restoring stable production, velocity strings also reduce well capacity, easily by up to 50%. In PDO, a sliding side door (SSD) was introduced as part of the velocity string completion to reduce the loss of capacity by facilitating additional gas flow via the new annulus created between velocity string and original tubing. This paper documents different field cases that demonstrate how the SSD is manipulated to … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
references
References 1 publication
0
0
0
Order By: Relevance