Large diameter borehole drilling in fractured soft coal
seam may
lead to problems such as drilling blockage, perforation, and hole
collapse. The protective screen pipe in the drilling hole can support
the damaged coal, prevent the drilling blockage, and improve the coal
permeability. The mathematical model of gas drainage by large diameter
borehole in fractured soft coal seam was established. Taking the 3205
working face in Shanxi Fenxi Zhongxing Coal Mine as the background,
the numerical simulation was carried out by importing the mathematical
model into COMSOL Multi-physics software to study the gas migration
law around large boreholes with protective screen pipe in fractured
soft coal seam. The results show that the gas flow velocity in section
A of the borehole and pipe is between 0 and 0.25 m/s, and the gas
flow velocity in the borehole is smaller than that in the pipe and
screen hole. The gas velocity in the borehole is lower than that in
the protective screen pipe. In the large diameter borehole, the protective
screen pipe can support the collapsed coal and prevent the borehole
blockage. The free gas in the borehole can be quickly extracted out
through the screen holes, which ensures the gas extraction efficiency.
The results provide a guidance for promotion and application of the
technology of large diameter borehole with protective screen pipe
in field.