2008
DOI: 10.3182/20080706-5-kr-1001.02520
|View full text |Cite
|
Sign up to set email alerts
|

Bottlenecks in Production Lines with Rework: A Systems Approach

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2010
2010
2024
2024

Publication Types

Select...
5
1
1

Relationship

1
6

Authors

Journals

citations
Cited by 10 publications
(3 citation statements)
references
References 5 publications
0
3
0
Order By: Relevance
“…(Fig.2 n -number of distributed machines. [4,5,6] The solution is based on the assumption that the transport cost per unit distance is the same between all machine workplaces. In the given example the saving of material flows is 10.8%.…”
Section: Modification Of the Triangle Net Methodsmentioning
confidence: 99%
“…(Fig.2 n -number of distributed machines. [4,5,6] The solution is based on the assumption that the transport cost per unit distance is the same between all machine workplaces. In the given example the saving of material flows is 10.8%.…”
Section: Modification Of the Triangle Net Methodsmentioning
confidence: 99%
“…Machine breakdown (Wazed et al, 2010); (Nakata et al, 1999); (Chiang et al, 2001); (Riezebos et al, 2003); (Roser et al, 2002(Roser et al, , 2002b; (Leporis and Zedenka, 2010); (Liu et al, 2004); (Sui-Hua, 2005); (Hwang and Singh, 1998); (Kuo et al, 1996); (Biller et al, 2010); (Chiang et al, 2000); (Chiang et al, 1998); (Yano, 1987); (Identifying Bottleneck Cells with Goal Programming, 2008); (Sengupta et al, 2008); (Roser et al, 2002(Roser et al, , 2002b; (Gunasekaran et al, 1998) Quality variation (Wazed et al, 2010); (Biller et al, 2010); (Chiang et al, 2000); (Chiang et al, 1998); (Ben-Daya and Rahim, 2003); (Identifying Bottleneck Cells with Goal Programming, 2008) Process variation (Wazed et al, 2010); (Jiang et al, 2003); (Sharda and Bury, 2010); (Grosfeld-Nir and Gerchak, 2004); (Biller et al, 2008); (Biller et al, 2010); (Ben-Daya and Rahim, 2003); (Identifying Bottleneck Cells with Goal Programming, 2008); (Gunasekaran et al, 1998) Inspection error and time (Wazed et al, 2010); (Darwish and Ben-Daya, 2007); (Ben-Daya and Rahim, 2003); (Identifying Bottleneck Cells with Goal Programming, 2008) Set-up a...…”
Section: Bottleneck Variable Referencementioning
confidence: 99%
“…By ignoring the smaller terms, equations (24) and (25) provide estimates of partial derivatives of P (g ss ) with respect to λ ij and µ ij , respectively. Therefore, by comparing these estimates, the largest ∂P (gss) Numerical experiments have been carried out to justify the bottleneck indicators introduced above.…”
Section: Remarkmentioning
confidence: 99%