Proceedings of Maintenance Performance Measurement and Management (MPMM) Conference 2014 2014
DOI: 10.14195/978-972-8954-42-0_25
|View full text |Cite
|
Sign up to set email alerts
|

Bottom to top approach for railway KPI generation

Abstract: A navegação consulta e descarregamento dos títulos inseridos nas Bibliotecas Digitais UC Digitalis, UC Pombalina e UC Impactum, pressupõem a aceitação plena e sem reservas dos Termos e Condições de Uso destas Bibliotecas Digitais, disponíveis em https://digitalis.uc.pt/pt-pt/termos.Conforme exposto nos referidos Termos e Condições de Uso, o descarregamento de títulos de acesso restrito requer uma licença válida de autorização devendo o utilizador aceder ao(s) documento(s) a partir de um endereço de IP da insti… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
7
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(7 citation statements)
references
References 4 publications
0
7
0
Order By: Relevance
“…This section deals with the concept of metrology and its relation with the data reliability provided by the sensors that are used in Condition Based Maintenance. According to [14], modern metrology introduces key factors such as downtime and product quality. [15] refers that, in the field of applied sciences, measurements are not accurate, as they are always subject to errors due to various causes, human and materials.…”
Section: Metrologymentioning
confidence: 99%
See 4 more Smart Citations
“…This section deals with the concept of metrology and its relation with the data reliability provided by the sensors that are used in Condition Based Maintenance. According to [14], modern metrology introduces key factors such as downtime and product quality. [15] refers that, in the field of applied sciences, measurements are not accurate, as they are always subject to errors due to various causes, human and materials.…”
Section: Metrologymentioning
confidence: 99%
“…For this reason, it becomes necessary to acquire calibration management strategies. As explains [14], a complete calibration, performed on large or complex machines can take several days. Therefore, it is necessary to define the best calibration strategy for the sensors, depending on their situation.…”
Section: Maintenance Of Calibrationmentioning
confidence: 99%
See 3 more Smart Citations