1993
DOI: 10.1080/09537289308919429
|View full text |Cite
|
Sign up to set email alerts
|

Building a short-term production planning system for flexible manufacturing systems: an integration viewpoint

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2001
2001
2018
2018

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Lashkari et al (1987) extended the formulation of the operation allocation problem to include the aspects of refixturing and limited tool availability. Chung and Lin (1993) discussed the short-term production planning (STPP) for FMS. They pointed out that the production objective of FMS should follow the results of MRP/CRP.…”
Section: The Fms: An Overviewmentioning
confidence: 99%
“…Lashkari et al (1987) extended the formulation of the operation allocation problem to include the aspects of refixturing and limited tool availability. Chung and Lin (1993) discussed the short-term production planning (STPP) for FMS. They pointed out that the production objective of FMS should follow the results of MRP/CRP.…”
Section: The Fms: An Overviewmentioning
confidence: 99%