Asia Pacific Oil and Gas Conference and Exhibition 2007
DOI: 10.2118/108831-ms
|View full text |Cite
|
Sign up to set email alerts
|

Building the Field Development Plan for a new gas field, located in Algeria, Reggane Trend

Abstract: One of the most critical stages after a field discovery is to define the Field Development Plan (FDP) for the new field; usually with limited information, managers must define the marketability of a prospect by taking as input the Hydrocarbon In Place (HIP), Hydrocarbons Rate of Production (HRP), Number of Wells (NW) and Drainage Location (DL), Plateau, Well Completion, Surfaces Facilities (SF) including pipelines and separation/compression systems; all these elements have to be economically evaluated and fina… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2014
2014
2020
2020

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 7 publications
0
2
0
Order By: Relevance
“…The performance prediction models are useful for predicting the EUR of a shale gas well, hence production potential of a specific area can be estimated. The EUR and production potential information are useful in field development planning stage; how many wells are drilled and when and where the wells need to be drilled [35][36][37][38][39].…”
Section: Development Of the Prediction Modelsmentioning
confidence: 99%
“…The performance prediction models are useful for predicting the EUR of a shale gas well, hence production potential of a specific area can be estimated. The EUR and production potential information are useful in field development planning stage; how many wells are drilled and when and where the wells need to be drilled [35][36][37][38][39].…”
Section: Development Of the Prediction Modelsmentioning
confidence: 99%
“…It plays a crucial role in the development to select an appropriate developing plan. 1,2 However, there always exist uncertainties when evaluating the development plans because of the limit, the subjectivity of human beings, and the uncertainties of the system itself. Thus, it is necessary to find a synthetic method to evaluate and optimize the oilfield development plans, which can deal with the uncertainties.…”
Section: Introductionmentioning
confidence: 99%