2016
DOI: 10.1134/s1062739116030657
|View full text |Cite
|
Sign up to set email alerts
|

Calculating stability of overburden dumps on weak bases

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
5
0

Year Published

2017
2017
2022
2022

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(5 citation statements)
references
References 3 publications
0
5
0
Order By: Relevance
“…The Simulink application works on the principles of visual programming, the required model is built from the library of standard blocks, and then the necessary calculations can be made. When working with this application, you need to know the basic techniques of working in the Simulink environment and the task under study [7][8][9][10].…”
Section: Methodsmentioning
confidence: 99%
“…The Simulink application works on the principles of visual programming, the required model is built from the library of standard blocks, and then the necessary calculations can be made. When working with this application, you need to know the basic techniques of working in the Simulink environment and the task under study [7][8][9][10].…”
Section: Methodsmentioning
confidence: 99%
“…When conducting mathematical analysis, it is advisable to use the E-network apparatus [1,2]. E-networks are essentially a generalization of Petri nets, they are a graphical and mathematical apparatus for modeling various systems.…”
Section: Methodsmentioning
confidence: 99%
“…Scholars in the open-air mining industry have attached great importance to the research of the waste dump. Its stability analysis is one of the hot issues in the field of open mining and geotechnical engineering [6][7][8][9][10]. With the development of open-pit mining, the stability of open-pit high slope and inclined shaft has also become one of the key technical problems in mine resources development [11].…”
Section: Introductionmentioning
confidence: 99%