2022
DOI: 10.26730/1816-4528-2022-1-9-18
|View full text |Cite
|
Sign up to set email alerts
|

Calculation Algorithm for Inter-Barrier Pillar Width When Mining Potash Deposits With Different Mining Equipment in Order to Reduce Operational Losses

Abstract: This article proposes a step-by-step algorithm for selecting the minimum permissible (optimal) width of the interpillar pillar when mining the IV -th sylvinite layer when applying the technological scheme of layer excavation of the Third Potash horizon with sequential mining of layers in areas with a stable direct roof and possible re-use of the transport drifts of the faces. The development system scheme is proposed. The technological schemes of preparation and mining of potassium formations for the Starobins… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 1 publication
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?