2016 International Seminar on Intelligent Technology and Its Applications (ISITIA) 2016
DOI: 10.1109/isitia.2016.7828701
|View full text |Cite
|
Sign up to set email alerts
|

Calculation of electrical energy with solar power plant design

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
15
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
7
1

Relationship

1
7

Authors

Journals

citations
Cited by 20 publications
(15 citation statements)
references
References 1 publication
0
15
0
Order By: Relevance
“…Current advancements in the performance evaluation of PV systems show an increased focus on assessing the reliability of PV cells [4], solar panels [5], solar probes [6], solar roadways [7], solar inverter equipment [8,9], and entire PV systems with and without accumulator [10]. Additionally, by assessing the reliability of modern PV systems, the authors in [11][12][13][14] aim to evaluate the performance output of their proposed PV equipment. Despite this, to the best of our knowledge, there is little or no evidence in the literature of reliability investigations concerning mobile PV panel reliability where circuitry and system complexity improves considerably.…”
Section: Framework Of Pv Systems Assessmentmentioning
confidence: 99%
See 1 more Smart Citation
“…Current advancements in the performance evaluation of PV systems show an increased focus on assessing the reliability of PV cells [4], solar panels [5], solar probes [6], solar roadways [7], solar inverter equipment [8,9], and entire PV systems with and without accumulator [10]. Additionally, by assessing the reliability of modern PV systems, the authors in [11][12][13][14] aim to evaluate the performance output of their proposed PV equipment. Despite this, to the best of our knowledge, there is little or no evidence in the literature of reliability investigations concerning mobile PV panel reliability where circuitry and system complexity improves considerably.…”
Section: Framework Of Pv Systems Assessmentmentioning
confidence: 99%
“…Their experimental results, which were carried out for 50 locations, for a total of 200 simulations, show that the proposed simplified model together with a regression model achieve increased accuracy comparable to high-quality simulation tools. The authors in [12] evaluate the power output of a solar plant design that was deployed on the rooftop of a building in order to examine the drawbacks of connecting multiple solar panels in a grid. Their investigations demonstrate that mounting several modules at an increased distance causes PV system energy loss.…”
Section: Framework Of Pv Systems Assessmentmentioning
confidence: 99%
“…A study was also conducted by Diantari and Pujotomo. in designing a solar power system with a capacity of 5 kW [30]. Khin et al estimated solar radiation and optimal tilt angle in photovoltaic systems in campus buildings [31].…”
Section: Introductionmentioning
confidence: 99%
“…Autonomy challenge is caused by limited human resources, particularly in terms of technical mastery, budget management, and time. The lack of quali cations for solar power plant operators has resulted in a limited standard of operator awareness in operating and maintaining solar power plants [15,16]. The challenge of the autonomy of human resources in solar power plants has made the measurement of management autonomy index as an essential element in the assessment of evaluation and planning of strategies for increasing the autonomy of energy management for solar power plants [17].…”
Section: Background Introductionmentioning
confidence: 99%