2002
DOI: 10.2175/193864702785665067
|View full text |Cite
|
Sign up to set email alerts
|

Calibration of a Bank Erosion Model on a Large Midwestern Alluvial River

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…The sensor measurements were validated in the field using a gauge plate and digital, time-lapse photography by an outside consultant. 34 During rain events, photos were taken of the ponded water and gauge plate measurement every ten minutes (ESI† Fig. A1).…”
Section: Methodsmentioning
confidence: 99%
“…The sensor measurements were validated in the field using a gauge plate and digital, time-lapse photography by an outside consultant. 34 During rain events, photos were taken of the ponded water and gauge plate measurement every ten minutes (ESI† Fig. A1).…”
Section: Methodsmentioning
confidence: 99%