2021
DOI: 10.1016/j.fusengdes.2021.112744
|View full text |Cite
|
Sign up to set email alerts
|

Calibration of the KIT test setup for the cooling tests of a gyrotron cavity full-size mock-up equipped with mini-channels

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
2
1

Relationship

1
2

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 7 publications
0
2
0
Order By: Relevance
“…For cavities equipped with MCs, some experimental indications of the reliability of the adopted model came recently from the tests of a cavity mock-up at KIT [49]. However, a very limited temperature range was tested in the 2020 test campaign, which cannot be representative of the actual working conditions in the gyrotron cavity.…”
Section: Validation Of the Th Modelmentioning
confidence: 99%
See 1 more Smart Citation
“…For cavities equipped with MCs, some experimental indications of the reliability of the adopted model came recently from the tests of a cavity mock-up at KIT [49]. However, a very limited temperature range was tested in the 2020 test campaign, which cannot be representative of the actual working conditions in the gyrotron cavity.…”
Section: Validation Of the Th Modelmentioning
confidence: 99%
“…More relevant measured data will be available from the tests of the cylindrical mockup of a 140 GHz cavity equipped with MCs [35]. The tests will be performed at the KIT test bench [49] by the end of 2021, using inductive heating and both water and air as coolant.…”
Section: Planned Experimental Campaignsmentioning
confidence: 99%