2021
DOI: 10.1016/j.procs.2021.01.293
|View full text |Cite
|
Sign up to set email alerts
|

Capacity planning of a mixed-model assembly line for prefabricated housebuilding elements

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
2
0
1

Year Published

2021
2021
2024
2024

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(3 citation statements)
references
References 15 publications
0
2
0
1
Order By: Relevance
“…Searching for current literature specifically about the functions process and capacity planning suggests a high availability of Industry 4.0 approaches in these areas (e.g. Trstenjaka & Cosic, 2017;Chien, Dou & Fu, 2018;Huka, Grenzfurtner, Zauner & Gronalt, 2021). In contrast, lot-sizing and production order scheduling have not been related to Industry 4.0 approaches in the current literature.…”
Section: Discussion and Future Researchmentioning
confidence: 99%
“…Searching for current literature specifically about the functions process and capacity planning suggests a high availability of Industry 4.0 approaches in these areas (e.g. Trstenjaka & Cosic, 2017;Chien, Dou & Fu, 2018;Huka, Grenzfurtner, Zauner & Gronalt, 2021). In contrast, lot-sizing and production order scheduling have not been related to Industry 4.0 approaches in the current literature.…”
Section: Discussion and Future Researchmentioning
confidence: 99%
“…Task assignment was studied in various applications. Cetin et al (2020) and Huka et al (2021) studied personnel task assignment problems. They developed a multi-objective mathematical model to assign the number of transactions to employees in a bank by considering this problem as GAP.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Além disso, existem situações em que as variáveis podem assumir valores reais, caracterizando a Programação Linear Inteira Mista (PLIM) (Vanderbei, 2020). Como exemplos da PLIM, podem ser citados: a aplicação para os limites de tempo na cadeia de suprimentos, o suporte ao planejamento da capacidade produtiva, o sequenciamento de produtos e quantidade de pessoal em linhas de montagem paralelas (Gamrath et al, 2019;Huka et al, 2021).…”
Section: Introductionunclassified