2016
DOI: 10.1007/s10845-016-1207-0
|View full text |Cite
|
Sign up to set email alerts
|

Capacity planning with ant colony optimization for TFT-LCD array manufacturing

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
8
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 11 publications
(8 citation statements)
references
References 36 publications
0
8
0
Order By: Relevance
“…The significant competitive parameter is a high due date adherence, in other to prevent instability in the mix end products to be produced which can cause the customization which significantly shares of the distributed end products that are exceptional and to prevent creating variable load for departments preparing new items for manufacturing and assembly for the construction department [22]. As the demand for customization fluctuate Periodic capacity deficits are likely to arise in preproduction departments, causing the release of work orders to slow down from the overdue start of manufacturing which makes it a necessity to updated or generated routines and operation times, The Bill of Materials (BOM) and NC-programs [23].…”
Section: Capacity Planningmentioning
confidence: 99%
See 1 more Smart Citation
“…The significant competitive parameter is a high due date adherence, in other to prevent instability in the mix end products to be produced which can cause the customization which significantly shares of the distributed end products that are exceptional and to prevent creating variable load for departments preparing new items for manufacturing and assembly for the construction department [22]. As the demand for customization fluctuate Periodic capacity deficits are likely to arise in preproduction departments, causing the release of work orders to slow down from the overdue start of manufacturing which makes it a necessity to updated or generated routines and operation times, The Bill of Materials (BOM) and NC-programs [23].…”
Section: Capacity Planningmentioning
confidence: 99%
“…The MPS should be kept up to date [13] ii. In one system there should be an incorporation of various horizons in the order of planning [22] iii. The order of the customer which is the end product is concerned with the released order and capacity planning [23].…”
Section: The Solution To Capacity Planning and Schedulingmentioning
confidence: 99%
“…Electromechanical constants of composites' constituents. [13,15] PZT Once the solutions of fiber coefficients are obtained, the corresponding matrix unknowns can be derived through Equation ( 31) and (32), finally giving full access to the local elastic and electric field within square or hexagonal unit cells. The effective piezoelectric coefficients can thus be predicted through integrating over the unit cell's domain that is elaborated in the next section.…”
Section: Exterior Problemmentioning
confidence: 99%
“…[ 32 ] Still, based on the mesh discretization of RUCs, FVDAM adopts surface‐averaged continuities among adjacent subvolumes instead of node‐to‐node continuities by finite element methods (FEM) and is thus treated as an attractive alternative to the most dominant FEM. [ 33 ] Recently Chen et al, [ 13,34 ] expanded the FVDAM with Multiphysics capability and several results are employed herein for comparison.…”
Section: Numerical Validations and Investigationsmentioning
confidence: 99%
See 1 more Smart Citation