2019
DOI: 10.1007/s13201-019-0939-3
|View full text |Cite
|
Sign up to set email alerts
|

Cascade hydropower systems optimal operation: implications for Iran’s Great Karun hydropower systems

Abstract: Water resources optimal allocation in large complex water systems such as multi-reservoir dams is a challenging task for decision makers. Wide range of decision variables as well as difficult nonlinear optimization problems (highly nonlinear problems) make it difficult to use optimization approaches. Alternatively, simulation-optimization approaches are then providing more realistic and applicable solution. This study presents a simulation-optimization framework for extracting monthly long-term operation rules… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(5 citation statements)
references
References 28 publications
0
5
0
Order By: Relevance
“…Further research can be conducted on applying this procedure to cascading conduit hydropower installations. Although the optimization of operating cascading water infrastructure has been researched for conventional reservoir storage or run-of-river installations [95][96][97][98], it has not been attempted for conduit hydropower installations.…”
Section: Discussionmentioning
confidence: 99%
“…Further research can be conducted on applying this procedure to cascading conduit hydropower installations. Although the optimization of operating cascading water infrastructure has been researched for conventional reservoir storage or run-of-river installations [95][96][97][98], it has not been attempted for conduit hydropower installations.…”
Section: Discussionmentioning
confidence: 99%
“…In contrast, in this work, owing to their function for prosumers, smaller installations-pico and micro-are given primary emphasis. The prospective model encompasses numerous formerly abandoned mills with small ponds (run-of-river HP) [12,13], which, when engaged, may significantly…”
Section: Literature Reviewmentioning
confidence: 99%
“…In contrast, in this work, owing to their function for prosumers, smaller installations-pico and micro-are given primary emphasis. The prospective model encompasses numerous formerly abandoned mills with small ponds (run-of-river HP) [12,13], which, when engaged, may significantly decrease capital expenditures. For instance, in Poland, currently fewer than 5% of such installations are used for energy production [14], thus the application area of the research presented here is meaningful.…”
Section: Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…However, simulation models are very time-consuming in complex operation cases with a large number of operational policies. Thus, several studies of large-scale systems use optimization models to preliminary screen such operation policies to significantly improve simulation model efficiency [96][97][98][99]. In this respect, the simulation and the optimization models are preferred to work in a loop sequentially, where the optimization models use the simulation model outputs to find the optimal solution that can then be considered a bettersimplified input to the simulation model.…”
Section: Topic 1: Optimization Modelsmentioning
confidence: 99%