Case Study: Bus Fleet Replacement

Abstract: Parallel replacement analysis is concerned with determining minimum cost replacement schedules for a group of assets that are economically interdependent and operate in parallel. That is, keep and replace decisions are required for each asset among a group of assets over a specified horizon. The assets are economically linked through economies of scale or budgeting constraints. One application of parallel replacement analysis is fleet replacement. We recently studied the operations, including fleet replacement… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

1
20
0

Year Published

2010
2010
2017
2017

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 37 publications
(21 citation statements)
references
References 13 publications
1
20
0
Order By: Relevance
“…Liao and Rittscher [20] suggest a genetic model designed to enhance supplier flexibility in the supplier selection process given normally distributed random demand and capacity constraints with the acceptable assumption that such enhancement would contribute to greater flexibility throughout the supply chain. In a case study of replacing the bus fleet of a large organization, Keles and Hartman [21] used an MIP model and sensitivity analysis to obtain an optimal solution for dynamic business environment changes. The objective of this study was to determine optimal long-term timetables for replacing the old bus fleet, with several manufacturers submitting proposals.…”
Section: Review Of Supplier Selection Methodsmentioning
confidence: 99%
“…Liao and Rittscher [20] suggest a genetic model designed to enhance supplier flexibility in the supplier selection process given normally distributed random demand and capacity constraints with the acceptable assumption that such enhancement would contribute to greater flexibility throughout the supply chain. In a case study of replacing the bus fleet of a large organization, Keles and Hartman [21] used an MIP model and sensitivity analysis to obtain an optimal solution for dynamic business environment changes. The objective of this study was to determine optimal long-term timetables for replacing the old bus fleet, with several manufacturers submitting proposals.…”
Section: Review Of Supplier Selection Methodsmentioning
confidence: 99%
“…In the road transport sector, the efficient use of assets is linked to a well-structured policy of fleet evaluation and replacement. Some cases of fleet replacement applied to urban buses are reported in [10,19,25,30,40,43,45,51,55]. Beichelt [10] proposes a policy for optimal scheduling replacement intervals of technical systems on the basis of a maintenance cost parameter: a system is replaced by a new one as soon as the maintenance cost within a replacement cycle reaches or exceeds a given level.…”
Section: State Of the Artmentioning
confidence: 99%
“…Franck et al [25] describe an industrial application of a Power Law Process (PLP) and a theoretical replacement model. Pinar and Hartman [40] adopt a model for a transit fleet replacement problem with multiple types of buses. However, many cost functions are highly simplified or not based on real data, and the authors do not study the variability in vehicular characteristics, usages, and market fluctuations.…”
Section: State Of the Artmentioning
confidence: 99%
“…For fleet replacement, the literature suggests two kinds of models: economic engineering (EE) and operational research (OR) models [12,16]. EE models are restricted to economic and financial aspects, with technological, management and strategic variables considered as exogenous.…”
Section: Introductionmentioning
confidence: 99%