Causes, Effects, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

6
123
0
6

Year Published

2015
2015
2024
2024

Publication Types

Select...
6
3

Relationship

0
9

Authors

Journals

citations
Cited by 190 publications
(135 citation statements)
references
References 13 publications
6
123
0
6
Order By: Relevance
“…Similarly, a technical report by Federal Construction Council [39] revealed the client's representative as the most significant source of excessive changes in construction. This is further supported by Alnuaimi et al [40] in a study on public construction projects in Oman where client's additional works is identified as the topmost factor causing changer orders. Again, Ijaola and Iyagba [41] also reported identical findings in both Nigeria and Oman.…”
Section: Client-related Causessupporting
confidence: 49%
“…Similarly, a technical report by Federal Construction Council [39] revealed the client's representative as the most significant source of excessive changes in construction. This is further supported by Alnuaimi et al [40] in a study on public construction projects in Oman where client's additional works is identified as the topmost factor causing changer orders. Again, Ijaola and Iyagba [41] also reported identical findings in both Nigeria and Oman.…”
Section: Client-related Causessupporting
confidence: 49%
“…Design cannot be developed in a proper manner if too little time is provided, and the designer is forced to complete the design at a lower quality. "Unrealistic design period" is ranked 3rd and 7th by contractors and overall respondents, respectively, as a cause of change orders (Alnuaimi et al, 2010). The results show that clients and consultants agree concerning the level of importance of providing adequate time for the designers to complete the design documents.…”
Section: Discussionmentioning
confidence: 57%
“…Alnuaimi et al (2010) found in a study in Oman that the top three effects of VOs were (1) delays, (2) claims and disputes and (3) cost overruns. Moreover, Ijaola and Iyagba (2012) studied VOs in Nigeria and found the top three effects of VOs to be (1) claims and disputes, (2) delays and (3) cost overruns.…”
Section: Literature Reviewmentioning
confidence: 99%
“…For instance, Alnuaimi et al (2010) explored the causes of VOs in construction projects in Oman and found the top three reasons of VOs to be related to (1) additional work instructed by owner, (2) modifications by owners and (3) non-availability of manuals and specifications. Muhammad et al (2010) looked into the causes of VOs in construction projects of Malaysia and found that the top three reasons of VOs were (1) change in plans by owner, (2) substitution of materials and (3) change in design by consultant.…”
Section: Literature Reviewmentioning
confidence: 99%