2017
DOI: 10.1061/(asce)co.1943-7862.0001222
|View full text |Cite
|
Sign up to set email alerts
|

Causes of Construction Delays in Countries with High Geopolitical Risks

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

2
42
0
1

Year Published

2017
2017
2024
2024

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 67 publications
(45 citation statements)
references
References 51 publications
2
42
0
1
Order By: Relevance
“…• Digital design communication tools: Digital Twin, Building Information Systems (BIM) including Revit, ArchiCAD, Navisworks, BIMx, BricsCAD, Archibus, Constructor, IntelliCAD, VisualARQ, Revizto; Geographic Information Systems (GIS) including QGIS, ArcGIS, and ArcMap [17]. The literature frequently reports that design mistakes, errors, changing orders and scopes, later approvals, and late technical decision makings were the main causes of delay in different contexts [95,99,104]. • Digital communication systems: cloud-based tools, emails, smart phones, and radio communication systems.…”
Section: Discussion and The Dec Conceptual Modelmentioning
confidence: 99%
See 2 more Smart Citations
“…• Digital design communication tools: Digital Twin, Building Information Systems (BIM) including Revit, ArchiCAD, Navisworks, BIMx, BricsCAD, Archibus, Constructor, IntelliCAD, VisualARQ, Revizto; Geographic Information Systems (GIS) including QGIS, ArcGIS, and ArcMap [17]. The literature frequently reports that design mistakes, errors, changing orders and scopes, later approvals, and late technical decision makings were the main causes of delay in different contexts [95,99,104]. • Digital communication systems: cloud-based tools, emails, smart phones, and radio communication systems.…”
Section: Discussion and The Dec Conceptual Modelmentioning
confidence: 99%
“…Unique factors (with the frequency of three or less) are: "'Slow decision making process by owner" in Norway [90], UAE [84], and Oman [98]; "Changes in material types and specifications during construction" in Saudi Arabia [102], Turkey [117], and Zambia [113]; "Change/selection of subcontractors in the project" in India [79], Saudi Arabia [112], and Vietnam [105]; "Mobilization delay" in India [127], Malaysia [109], and Malawi [81]; "Site constraints (site blockage, impact of other's land)" in Bangladesh [87], Cambodia [103], and countries with high geopolitical risks [104]; "Impact of subsurface (underground) conditions" in Libya [91], Cambodia [103], and Egypt [123]; "Conflict between parties' in Iran [101], Turkey [70], and Egypt [107]; "Errors in construction" in Iran [93], Zambia [113], and Denmark [89]; "Fluctuation in price of materials" in Saudi Arabia [102] and Ghana [100]; "Conflict between labours" in Saudi Arabia [88] and Zambia [113]; "Labour strikes" in countries with high geopolitical risks [104] and Zambia [113]; "Using inappropriate construction methods" in India [92] and Iran [110]; "Insufficient/inaccurate document preparation" in Turkey [70] and Iran [110]; "Inaccurate first drafts/plan" in Iran [110] and Taiwan [132]; "Delay/weak interaction due to vendor" in India [127] and Oman…”
Section: Key Factors Identified In the Delay Literaturementioning
confidence: 99%
See 1 more Smart Citation
“…Some have even argued that most researchers have wrongly concluded that cost overrun, escalation and growth are the same. Almost all publications in this area acknowledged that the problem of rework still remains an inescapable issue and common occurrence for Governments internationally [34,35,36,31,37,38,39,40,41,42]. Most studies have it that incongruous design information contributes to this menacing problem.…”
Section: Current Research Developmentsmentioning
confidence: 99%
“…Any parties of a project might be responsible for the delay cause (Chan, Kumaraswamy 2002;Assaf, Al-Hejji 2006;González et al 2014;Kadry et al 2016). So, when a problem relating to delay is being settled, these different parties must decide about their share in delay occurrence.…”
Section: Introductionmentioning
confidence: 99%