Causes of contractors’ claims in international engineering-procurement-construction projects

Abstract: Abstract. Engineering-Procurement-Construction (EPC) method has increasingly been applied in international markets. In this research, the causes of contractors' claims in international EPC projects are modeled and empirically tested with industry survey, structural equation modeling and case studies from the perspective of Chinese contractors. The established model outlines the causes of contractors' claims as: external risk (sociopolitical risks, economic risks, and natural hazards), clients' organizational b… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
44
0
3

Year Published

2018
2018
2024
2024

Publication Types

Select...
4
2
1

Relationship

1
6

Authors

Journals

citations
Cited by 80 publications
(61 citation statements)
references
References 67 publications
0
44
0
3
Order By: Relevance
“…Design-related contract management mainly includes design responsibility specification and claim management in hydropower EPC project delivery [34,54]. Design management of international hydropower EPC project starts from reviewing conceptual design for contractor-designer alliance to win EPC contracts [15].…”
Section: Design Managementmentioning
confidence: 99%
See 3 more Smart Citations
“…Design-related contract management mainly includes design responsibility specification and claim management in hydropower EPC project delivery [34,54]. Design management of international hydropower EPC project starts from reviewing conceptual design for contractor-designer alliance to win EPC contracts [15].…”
Section: Design Managementmentioning
confidence: 99%
“…It is difficult to agree on whether clients' orders have changed the scope of work or not [57]. Unclear project definition in contracts prepared on the basis of conceptual design and clients' organizational behaviors, such as change orders, are main causes of claims in international hydropower EPC project delivery [34]. Timely process of claims caused by the implementation of owners' orders for variation should be an emphasis of design-related contract management of hydropower EPC projects [58].…”
Section: Design Managementmentioning
confidence: 99%
See 2 more Smart Citations
“…Portanto, é mais difícil para as empresas de construção tornarem-se globais e realizarem seus objetivos de internacionalização do que para as empresas de outros segmentos. Como resultado, os problemas envolvidos na melhoria do processo de internacionalização desse setor têm atraído mais atenção nas últimas duas décadas; por exemplo: Ofori, 2003;Low e Jiang, 2003, 2004Mutti, 2004;Gunhan e Arditi, 2005a, 2005bBest e Langston, 2006;Ling e Kwok, 2007; Javernick-Will e Scott, 2010; Shen et al, 2017). (FLANAGAN, 1994;MUTTI, 2004;ARDITI, 2005a;LING et al, 2005), redes internacionais (GUNHAN; ARDITI, 2005b), reputação e história (FLANAGAN, 1994;LING et al, 2005;SHEN, 2008), recursos humanos bem treinados FLANAGAN, 1994;ARDITI, 2005a;LING et al, 2005;SHEN, 2008), fatores culturais e geográficos, legais, fiscais, econômicos e produtivos (MUTTI, 2004) e conhecimento dos sistemas e políticas dos países estrangeiros (FLANAGAN, 1994;DENG et al, 2014;KADRY;OSMAN;GEORGY, 2017).…”
Section: Contextualizaçãounclassified